Merrill-Bell Shaft
This prospected operated in 1903. During this time a timbered 60ft. shaft was sunk, one mile from the Portage Lake Mine.

This prospected operated in 1903. During this time a timbered 60ft. shaft was sunk, one mile from the Portage Lake Mine.